Please use this identifier to cite or link to this item:
https://hdl.handle.net/2440/354
Type: | Journal article |
Title: | Forward delay times in multi-phase discrete-time renewal processes |
Author: | Pearce, C. Roughan, M. |
Citation: | Asia-Pacific Journal of Operational Research, 1997; 14(1):77-86 |
Publisher: | Operational Research Society of Singapore |
Issue Date: | 1997 |
ISSN: | 0217-5959 |
Abstract: | A type of discrete-time Markov renewal process is considered in which the epochs at which the process changes state are not all regeneration points. Such processes arise naturally in breakdown/repair models and in variants of the M/G/1 queue such as occur in modelling road traffic. The key renewal theorem is used to find a relationship between the residual sojourn times (or forward delay times) and sojourn times through the system. |
Appears in Collections: | Applied Mathematics publications Aurora harvest |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.