Please use this identifier to cite or link to this item:
https://hdl.handle.net/2440/87676
Citations | ||
Scopus | Web of Science® | Altmetric |
---|---|---|
?
|
?
|
Type: | Journal article |
Title: | Critical success factors for BOT electric power projects in China: thermal power versus wind power |
Author: | Zhao, Z. Zuo, J. Zillante, G. Wang, X. |
Citation: | Renewable Energy, 2010; 35(6):1283-1291 |
Publisher: | Elsevier |
Issue Date: | 2010 |
ISSN: | 0960-1481 1879-0682 |
Statement of Responsibility: | Zhen-Yu Zhao, Jian Zuo, George Zillante, Xin-Wei Wang |
Abstract: | Abstract not available |
Keywords: | BOT; Critical success factors; China; Thermal power project; Wind power project |
Rights: | © 2009 Elsevier Ltd. All rights reserved. |
DOI: | 10.1016/j.renene.2009.09.016 |
Published version: | http://dx.doi.org/10.1016/j.renene.2009.09.016 |
Appears in Collections: | Architecture publications Aurora harvest 7 |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.