Please use this identifier to cite or link to this item:
https://hdl.handle.net/2440/94842
Citations | ||
Scopus | Web of Science® | Altmetric |
---|---|---|
?
|
?
|
Type: | Journal article |
Title: | Production data analysis of coalbed methane wells to estimate the time required to reach to peak of gas production |
Author: | Salmachi, A. Yarmohammadtooski, Z. |
Citation: | International Journal of Coal Geology, 2015; 141-142:33-41 |
Publisher: | Elsevier |
Issue Date: | 2015 |
ISSN: | 0166-5162 1872-7840 |
Statement of Responsibility: | Alireza Salmachi, Zahra Yarmohammadtooski |
Abstract: | Abstract not available |
Keywords: | Coalbed methane; production data analysis; time of peak gas production; negative decline; simulation; production profile |
Rights: | © 2015 Elsevier B.V. All rights reserved. |
DOI: | 10.1016/j.coal.2015.02.006 |
Published version: | http://dx.doi.org/10.1016/j.coal.2015.02.006 |
Appears in Collections: | Aurora harvest 7 Australian School of Petroleum publications |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.