Please use this identifier to cite or link to this item: https://hdl.handle.net/2440/98413
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGunawan, I.-
dc.contributor.authorHodkinson, B.-
dc.date.issued2013-
dc.identifier.citationAsset Management and Maintenance Journal, 2013; 26(5):15-21-
dc.identifier.issn1835-789X-
dc.identifier.issn1835-7903-
dc.identifier.urihttp://hdl.handle.net/2440/98413-
dc.description.abstractIt is a legislative requirement to have a management system sufficient to ensure the continued integrity of pressure plant equipment, documented to an acceptable level. The main purpose of this paper is to develop and formalise a maintenance strategy for a Heat Recovery Steam Generator (HRSG) with a case study in the Bulwer Island Cogeneration Station is provided.-
dc.description.statementofresponsibilityIndra Gunawan, Bruce Hodkinson-
dc.language.isoen-
dc.publisherEngineering Information Transfer-
dc.rights© Engineering Information Transfer-
dc.source.urihttp://search.informit.com.au/documentSummary;dn=570171476515796;res=IELENG-
dc.titleMaintenance strategy for a heat recovery steam generator-
dc.typeJournal article-
pubs.publication-statusPublished-
dc.identifier.orcidGunawan, I. [0000-0001-7357-509X]-
Appears in Collections:Aurora harvest 3
Entrepreneurship, Commercialisation, and Innovation Centre publications

Files in This Item:
File Description SizeFormat 
hdl_98413.pdfPublished version1.04 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.