Hourly operation strategy of a CCHP system with GSHP and thermal energy storage (TES) under variable loads: a case study

dc.contributor.authorLiu, W.
dc.contributor.authorChen, G.
dc.contributor.authorYan, B.
dc.contributor.authorZhou, Z.
dc.contributor.authorDu, H.
dc.contributor.authorZuo, J.
dc.date.issued2015
dc.description.abstractAbstract not available
dc.description.statementofresponsibilityWei Liu, Guanyi Chen, Beibei Yan, Zhihua Zhou, Haowei Du, Jian Zuo
dc.identifier.citationEnergy and Buildings, 2015; 93:143-153
dc.identifier.doi10.1016/j.enbuild.2015.02.030
dc.identifier.issn0378-7788
dc.identifier.issn1872-6178
dc.identifier.orcidZuo, J. [0000-0002-8279-9666]
dc.identifier.urihttp://hdl.handle.net/2440/108183
dc.language.isoen
dc.publisherElsevier
dc.rights© 2015 Published by Elsevier B.V.
dc.source.urihttps://doi.org/10.1016/j.enbuild.2015.02.030
dc.subjectCCHP system; thermal energy storage; GSHP; operation strategy
dc.titleHourly operation strategy of a CCHP system with GSHP and thermal energy storage (TES) under variable loads: a case study
dc.typeJournal article
pubs.publication-statusPublished

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
RA_hdl_108183.pdf
Size:
1.36 MB
Format:
Adobe Portable Document Format
Description:
Restricted Access