Motevallian, B.Luong, L.H.S.Abhary, K.G.Marian, R.M.2025-12-172025-12-172005Proceedings of the International Manufacturing Leaders Forum on Global Competitive Manufacturing, 2005, pp.1-8https://hdl.handle.net/1959.8/28083enCopyright status unknownDisassembly plansprecedence constraintsfeasible sequencesoptimum sequenceA heuristic method to generate an optimum disassembly sequenceConference paper