Please use this identifier to cite or link to this item: https://hdl.handle.net/2440/126269
Citations
Scopus Web of Science® Altmetric
?
?
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGorjian Jolfaei, N.-
dc.contributor.authorJin, B.-
dc.contributor.authorvan der Linden, L.-
dc.contributor.authorGunawan, I.-
dc.contributor.authorGorjian, N.-
dc.date.issued2019-
dc.identifier.citationQuality and Reliability Engineering International, 2019; 36(2):784-796-
dc.identifier.issn0748-8017-
dc.identifier.issn1099-1638-
dc.identifier.urihttp://hdl.handle.net/2440/126269-
dc.descriptionFirst published: 24 November 2019-
dc.description.abstractPower generators are critical assets in wastewater treatment plants (WWTPs) in Australia and many countries. Better managing the lifetime, minimising failures, improving reliability and availability, and reducing operating and maintenance costs of the power generation assets are still challenging topics for water utilities. This case study aims to develop power generation system reliability and availability modelling considering redundancy to minimise operation and maintenance costs. The two‐parameter Weibull model was used to assess system reliability and availability to power generation engines in WWTPs. The Kaplan‐Meier method (a time‐driven estimation technique) and the log beta‐Weibull model (which is suitable for modelling censored and uncensored data) were used to analyse and validate the modelling results. Shape and scale parameters of the Weibull models were estimated by maximising the log‐likelihood function using non‐linear optimisation. Hazard and reliability functions were calculated using the Weibull model. Results using two‐parameter Weibull, Kaplan‐Meier, and log beta‐Weibull models display low reliability and high hazard rate over time, which was associated with spark plug failure due to a suboptimal start and stop operation strategy.-
dc.description.statementofresponsibilityNeda Gorjian Jolfaei, Bo Jin, Leon van der Linden, Indra Gunawan, Nima Gorjian-
dc.language.isoen-
dc.publisherWiley-
dc.rights© 2019 John Wiley & Sons, Ltd.-
dc.source.urihttp://dx.doi.org/10.1002/qre.2573-
dc.subjectenergy management; hazard function; Kaplan-Meier estimator; log beta-Weibull model; power generation engine; reliability; Weibull model-
dc.titleReliability modelling with redundancy - A case study of power generation engines in a wastewater treatment plant-
dc.typeJournal article-
dc.identifier.doi10.1002/qre.2573-
pubs.publication-statusPublished-
dc.identifier.orcidGorjian Jolfaei, N. [0000-0001-6022-6210]-
dc.identifier.orcidGunawan, I. [0000-0001-7357-509X]-
Appears in Collections:Aurora harvest 8
Chemical Engineering publications

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.