Properties and performance of the prototype instrument for the Pierre Auger Observatory

Date

2004

Authors

Abraham, J.
Aglietta, M.
Aguirre, I.
Albrow, M.
Allard, D.
Allekotte, I.
Allison, P.
Alvarez-Muniz, J.
Do Amaral, M.
Ambrosio, M.

Editors

Advisors

Journal Title

Journal ISSN

Volume Title

Type:

Journal article

Citation

Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2004; 523(1-2):50-95

Statement of Responsibility

Auger Collaboration, ..., J. A. Bellido, ..., R. W. Clay, ..., B. R. Dawson, ..., G. J. Thornton, ..., N. R. Wild, et al.

Conference Name

Abstract

Construction of the first stage of the Pierre Auger Observatory has begun. The aim of the Observatory is to collect unprecedented information about cosmic rays above 1018 eV. The first phase of the project, the construction and operation of a prototype system, known as the engineering array, has now been completed. It has allowed all of the sub-systems that will be used in the full instrument to be tested under field conditions. In this paper, the properties and performance of these sub-systems are described and their success illustrated with descriptions of some of the events recorded thus far.

School/Discipline

Dissertation Note

Provenance

Description

Copyright © 2003 Elsevier B.V. All rights reserved.

Access Status

Rights

License

Grant ID

Call number

Persistent link to this record