Scheduling and performance evaluation of robotic flexible assembly cells under different dispatching rules
| dc.contributor.author | Abd, K.K. | |
| dc.contributor.author | Abhary, K.G. | |
| dc.contributor.author | Marian, R.M. | |
| dc.contributor.conference | 2011 International Conference on Mechanical, Industrial and Manufacturing Engineering (15 Jan 2011 - 16 Jan 2011 : Melbourne, Australia) | |
| dc.date.issued | 2012 | |
| dc.description.abstract | This paper addresses scheduling and evaluation of Robotic Flexible Assembly Cells (RFACs). Even though RFACs are capable of assembling a variety of products using the same resources, all previous studies have been devoted to scheduling RFACs for assembling a single product. The objective of the paper is to propose an algorithm deal with scheduling RFAC for assembly of multi-products. Four experiments are illustrated to schedule RFAC under different dispatching rules. Also, four performance measures are suggested to evaluate the cell performance. A case study is presented to illustrate applications of the proposed algorithm. The results of study demonstrate the effectiveness of the proposed algorithm to manage scheduling RFAC in a multi-product assembly environment. | |
| dc.identifier.citation | Advances in Mechanical Engineering (IERI), 2012, vol.2, iss.1, pp.31-40 | |
| dc.identifier.issn | 2160-0619 | |
| dc.identifier.uri | https://hdl.handle.net/1959.8/122286 | |
| dc.language.iso | en | |
| dc.publisher | Information Engineering Research Institute | |
| dc.publisher.place | Newark, Delaware | |
| dc.rights | Copyright 2011 Khalid Abd, Kazem Abhary and Romeo Marian | |
| dc.subject | assembly cells | |
| dc.subject | robotics | |
| dc.subject | scheduling rules | |
| dc.title | Scheduling and performance evaluation of robotic flexible assembly cells under different dispatching rules | |
| dc.type | Conference paper | |
| pubs.publication-status | Published | |
| ror.mmsid | 9915909752801831 |