A borehole stability study by newly designed laboratory tests on thick-walled hollow cylinders
| dc.contributor.author | Hashemi, S. | |
| dc.contributor.author | Melkoumian, N. | |
| dc.contributor.author | Taheri, A. | |
| dc.date.issued | 2015 | |
| dc.description.abstract | Abstract not available | |
| dc.description.statementofresponsibility | S.S. Hashemi, N. Melkoumian, A. Taheri | |
| dc.identifier.citation | Journal of Rock Mechanics and Geotechnical Engineering, 2015; 7(5):519-531 | |
| dc.identifier.doi | 10.1016/j.jrmge.2015.06.005 | |
| dc.identifier.issn | 1674-7755 | |
| dc.identifier.issn | 2589-0417 | |
| dc.identifier.orcid | Taheri, A. [0000-0003-4176-5379] | |
| dc.identifier.uri | http://hdl.handle.net/2440/97882 | |
| dc.language.iso | en | |
| dc.publisher | Elsevier | |
| dc.rights | © 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting by Elsevier B.V. All rights reserved. | |
| dc.source.uri | https://doi.org/10.1016/j.jrmge.2015.06.005 | |
| dc.subject | Real-time monitoring; Experimental investigation; Thick-walled hollow cylinder (TWHC); Poorly cemented sand formations | |
| dc.title | A borehole stability study by newly designed laboratory tests on thick-walled hollow cylinders | |
| dc.type | Journal article | |
| pubs.publication-status | Published |