Barr Smith Library entrance bridge reconstruction, 2007
Files
(Works advisory sign)
(The existing bridge prior to demolition)
(Construction of temporary walkway)
(Construction of temporary walkway)
(Erection of scaffolding)
Date
2007
Authors
Thomas, Stephen George Anthony
Editors
Advisors
Journal Title
Journal ISSN
Volume Title
Type:
Image
Citation
Statement of Responsibility
Conference Name
Abstract
Photographs between July and September 2007, detailing the reconstruction of the Barr Smith Library bridge, to provide for disability (wheelchair) access to the library.
School/Discipline
Dissertation Note
Provenance
Description
Photographs taken with a Nokia 6680 1Megapixel phonecam.