The economics of time delayed salinity impact management in the River Murray

Date

2008

Authors

Connor, J.

Editors

Advisors

Journal Title

Journal ISSN

Volume Title

Type:

Journal article

Citation

Water Resources Research, 2008; 44(3)

Statement of Responsibility

Conference Name

Abstract

Drainage from irrigation along the River Murray causes rising levels of saline discharge to the river and floodplains with adverse impacts including crop, water infrastructure and floodplain ecological health damage. These salinity impacts of drainage are time delayed by up to several decades. Investment in engineering infrastructure to pump saline water away from the river to evaporation basins has been a significant feature of public policy to address the issue. This article evaluates the costs and benefits of further engineering investments to offset expected future salinity growth. The analysis involves an integer programming optimization model that explicitly accounts for salinity impact time delays in benefit, cost accounting considering a long term, 100 year time horizon. A lower bound salinity growth scenario is evaluated involving increasingly efficient irrigation and further new irrigation development at locations where salinity impacts are comparatively small. This is compared to an upper bound salinity growth scenario with static irrigation efficiency and new irrigation development in high salinity impact areas. It is concluded that if conditions leading to the upper bound salinity growth scenario can not be avoided in the near term, the marginal costs of offsetting future salinity growth with additional engineering investment will exceed the marginal benefits several decades hence.

School/Discipline

Dissertation Note

Provenance

Description

Data source: Supporting information, http://onlinelibrary.wiley.com/doi/10.1029/2006WR005745/abstract#footer-support-info

Access Status

Rights

Copyright 2008 American Geophysical Union

License

Grant ID

Call number

Persistent link to this record