Hard rock deep hole cutting blasting technology in vertical shaft freezing bedrock section construction

Date

2015

Authors

Zheng, Z.
Xu, Y.
Dong, J.
Zong, Q.
Wang, L.

Editors

Advisors

Journal Title

Journal ISSN

Volume Title

Type:

Journal article

Citation

Journal of Vibroengineering, 2015; 17(3):1105-1119

Statement of Responsibility

Conference Name

Abstract

Using the traditional cutting blasting technology in vertical shaft construction has some features, e.g. slows driving speed, gangue with large volume and throwing high. Moreover, large explosive charge initiation has a serious influence on freezing pipes and freezing wall. In this study, the periphery hole charge and charge structure was optimized, and the blasting model of the bedrock vertical shaft section was established by using the ANSYS/LS-DYNA numerical simulation software. In addition, stress concentration of the large diameter empty hole and its influence of blasting efficiency in blasting were analyzed. The field experiment was conducted to verify the blasting results. The results show that using large diameter empty hole blasting technology in vertical shaft construction of frozen hard rock section can significantly improve the speed of vertical shaft construction, obtain the excellent blasting effect and guarantee the safety of freezing pipes and freezing wall.

School/Discipline

Dissertation Note

Provenance

Description

Access Status

Rights

Copyright 2015 JVE International

License

Grant ID

Published Version

Call number

Persistent link to this record