Efficient joint probability analysis of flood risk
Date
2015
Authors
Zheng, F.
Leonard, M.
Westra, S.
Editors
Advisors
Journal Title
Journal ISSN
Volume Title
Type:
Journal article
Citation
Journal of Hydroinformatics, 2015; 17(4):584-597
Statement of Responsibility
Feifei Zheng, Michael Leonard and Seth Westra
Conference Name
Abstract
Flood attributes such as the water level may depend on multiple forcing variables that arise from common meteorological conditions. To correctly estimate flood risk in these situations, it is necessary to account for the joint probability distribution of all the relevant forcing variables. An example of a joint probability approach is the design variable method, which focuses on the extremes of the forcing variables, and approximates the hydraulic response to forcing variables with a water level table. In practice, however, application of the design variable method is limited, even for the bivariate case, partly because of the high computational cost of the hydrologic/hydraulic simulations. We develop methods to minimise the computational cost and assess the appropriate extent and resolution of the water level table in a bivariate context. Flood risk is then evaluated as a bivariate integral, which we implement as an equivalent line integral. The line integral is two orders of magnitude quicker and therefore beneficial to settings that require multiple evaluations of the flood risk (e.g., optimisation studies or uncertainty analyses). The proposed method is illustrated using a coastal case study in which floods are caused by extreme rainfall and storm tide. An open-source R package has been developed to facilitate the uptake of joint probability methods among researchers and practitioners.
School/Discipline
Dissertation Note
Provenance
Description
Access Status
Rights
© IWA Publishing 2015