Site investigations and convergence measurements for a twin metro tunnel driven in Ankara clay, Turkey

Date

2006

Authors

Ozsan, A.
Karakus, M.

Editors

Advisors

Journal Title

Journal ISSN

Volume Title

Type:

Conference paper

Citation

Pre-Congress Proceedings of the 10th IAEG International Congress, IAEG2006, held in Nottingham, United Kingdom from 6th to 10th September 2006

Statement of Responsibility

Aydin Ozsan and Murat Karakus

Conference Name

IAEG International Congress 2006 (10th : 2006 : Nottingham)

Abstract

Over population and increase in the traffic congestion in urban areas have led to an inevitable rise in the construction of underground structures. Therefore, a project consisting of 9325m twin metro tunnel construction has been planned by the Greater Municipality of Ankara in order to help to ease transportation problems in Ankara, Turkey. This paper presents the geotechnical properties along the tunnel route, and construction of the Middle East Technical University (METU) twin metro tunnel between 2.720 and 4.000 km as a part of Ankara project III. The twin metro tunnel runs mainly through Ankara Clay above this is artificial fill material. Each tunnel has approximately 38 m2 cross-sectional area and is excavated in two stages in accordance with New Austrian Tunnelling Method (NATM). There have been several drilling holes conducted to investigate groundwater levels and engineering properties of the host medium; these will be examined in the paper. In order to monitor the amount of tunnel closure, convergence measurements taken during construction of the tunnel will be presented and discussed.

School/Discipline

Dissertation Note

Provenance

Description

© The Geological Society of London 2006 10th Congress of the International Association for Engineering Geology and the Environment – Engineering geology for tomorrow’s cities

Access Status

Rights

License

Grant ID

Call number

Persistent link to this record