Construction productivity analysis of pre-cast and conventional cast-in-situ projects: a case study in Malaysia

dc.contributor.authorGunawan, I.
dc.date.issued2013
dc.description.abstractAdvantages of pre-cast technology in the construction of commercial, residential and institutional buildings are well documented in literature. However, the acceptance of this technology in Malaysia is relatively low with few projects being constructed with pre-cast components. The objectives of this paper are to measure labor productivity in construction, to examine productivity indicators between pre-cast and conventional Cast-In-Situ (CIS) methods, and to explore areas of improvements to promote adoption of pre-cast technology in Malaysia. Data on construction labor productivity are collected using questionnaires, interviews, and observations at the construction sites. Based on statistical analysis performed in this paper, it is concluded that pre-cast method is better than conventional CIS method in terms of construction labor productivity, time to complete a project, variability of construction activities, and loss of efficiency during the construction process. Baseline productivity, unit rates for pre-cast components and correlation of the productivity factors to construction labor productivity are presented as well.
dc.description.statementofresponsibilityIndra Gunawan
dc.identifier.citationConstruction Engineering, 2013; 1(2):26-36
dc.identifier.issn2329-3365
dc.identifier.issn2329-3373
dc.identifier.orcidGunawan, I. [0000-0001-7357-509X]
dc.identifier.urihttp://hdl.handle.net/2440/98465
dc.language.isoen
dc.publisherScience and Engineering Publishing Company
dc.rightsJournals published by Science and Engineering Publishing Company (SEP) are open access. Copyright for articles published in any SEP journal is retained by the authors, with first publication rights granted to SEP. All journal content, except where otherwise noted, is licensed under Creative Commons Attribution-NonCommercial-NoDeriv 2.5 License. By virtue of their appearance in the open-access journal, articles are free to use, with proper attribution, in any non-commercial settings. Please click to download the "SEP Open Access Publishing Agreement".
dc.source.urihttp://www.seipub.org/ce/paperInfo.aspx?ID=2741
dc.subjectConstruction Labor Productivity; Conventional Cast-In-Situ; Pre-cast; Value and Benefit
dc.titleConstruction productivity analysis of pre-cast and conventional cast-in-situ projects: a case study in Malaysia
dc.typeJournal article
pubs.publication-statusPublished

Files

Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
hdl_98465.pdf
Size:
776.76 KB
Format:
Adobe Portable Document Format
Description:
Published version